On-site wastewater management (Septic Tank)
Onsite wastewater disposal
If you live on a property that is not connected to reticulated sewerage, you will need to manage the disposal of your wastewater on your property.
The Towards Better Onsite Wastewater Management in Victoria – Community Education Series are helpful fact sheets that have been developed to assist residents to understand their responsibilities and options for managing wastewater. These fact sheets cover the common types of systems, how they operate and how they need to be maintained.
Application to install/alter an onsite wastewater management system
Prior to submitting your application to install or alter an onsite wastewater management system it is recommended that you read the guidance information contained at the front of our application form. We also recommended that you refer to the information contained within fact sheets 1, 2, 6, 10 and 12 from the Towards Better Onsite Wastewater Management in Victoria – Community Education Series.
It is important to note that on site wastewater disposal systems are sized for the dwelling that they service not for the number of people that will occupy the dwelling once it has been constructed.
Once an application for the installation or alteration of an onsite wastewater management system has been submitted to Council, Council has 42 days to process the application and issue a Permit to Install or request additional information. No works should be commenced prior to the issuing of your permit. Should works commence without a permit, an infringement notice may be issued by Council.
The fees for permits are set by the legislation to see the current fee please see Council’s current fee structure.
Application for extension of time or to amend an onsite wastewater management permit
Once granted septic tank permits are valid for 3 years, however you can apply for a 2 year extension. The additional 2 years must be applied for at least twenty-eight (28) days prior to your permit expiring.
Should an extension of time be granted, it will be valid for 2 years. No additional extensions will be granted. If the system has not been installed and approved within this extended period of time, you will need to lodge a new 'application to install an onsite wastewater management system'.
If your permit to install/alter has already expired, and your system has not been approved by Council, you will be required to apply for a new application to install to ensure that your proposed wastewater system complies with the EPA Code of Practice and other relevant legislation.
Required inspections
On average 3 inspections are undertaken for all onsite wastewater management systems.
Initial site inspection
A site inspection to determine the suitability of your site will be carried out prior to issuing a permit to install.
It may be useful to request a joint inspection prior to lodging the application to discuss site issues or possible alternative systems.
To arrange an onsite inspection prior to installation, please call Council's Public Health Department on 5494 1200.
Inspection of installation
An inspection will be carried out by Council's Public Health Officer during the installation of your onsite wastewater treatment system to ensure compliance with permit conditions. Items that are assessed during the inspection include:
- The size, siting and installation of the septic tank or treatment plant
- The construction, siting and length of effluent distribution lines
- That inspection openings are up to ground level
- The use of geo-fabric material between the aggregate and top soil in the distribution lines
- The quality of the aggregate for the distribution lines.
To facilitate this inspection, the on-site treatment system and distribution lines should remain uncovered until after the inspection. Inspections are carried out during normal business hours and 24 hours notice is required.
Final inspection
Once Council has received a written request for a final inspection and all required documents a final inspection of the system will be carried out.
Following this inspection a ‘certificate to use’ will be issued. This certificate will be required by your building surveyor prior to the issuing of your occupancy permit.
Information and fact sheets
Information sheet - plumbers , service agents(PDF, 152KB)
Information sheet - land capability assessment(PDF, 181KB)
Fact Sheet 1 - Basic Design(PDF, 4MB)
Fact Sheet 2 - Package Treatment Plants(PDF, 4MB)
Fact Sheet 3 - Septic Tank with Sand(PDF, 2MB)
Fact Sheet 4 - Historic Septic Tank(PDF, 4MB)
Fact Sheet 5 - Greywater in Non-Sewered Areas(PDF, 1MB)
Fact Sheet 6 - Common Disposal Methods(PDF, 10MB)
Fact Sheet 7 - Common Disposal Methods Secondary(PDF, 3MB)
Fact Sheet 8 - Plumbers Responsibilities(PDF, 2MB)
Fact Sheet 9 - Service Agents(PDF, 1MB)
Fact Sheet 10 - Land Owners(PDF, 2MB)
Fact Sheet 11 - Home Owners and Renters(PDF, 2MB)
Fact Sheet 12 - Land Owner LCA(PDF, 1MB)
Fact Sheet 13 - Purchasing Real Estate(PDF, 3MB)